{"id":867,"date":"2026-04-17T11:45:50","date_gmt":"2026-04-17T08:45:50","guid":{"rendered":"https:\/\/starteline.fi\/?p=867"},"modified":"2026-04-17T13:12:35","modified_gmt":"2026-04-17T10:12:35","slug":"referenssikohde-folkhalsanhuset-haga-teline-ja-saasuojaus-skanskan-kohteessa","status":"publish","type":"post","link":"https:\/\/starteline.fi\/en\/2026\/04\/17\/referenssikohde-folkhalsanhuset-haga-teline-ja-saasuojaus-skanskan-kohteessa\/","title":{"rendered":"Reference project: Folkh\u00e4lsan House in Haga \u2013 scaffolding and weather protection for a Skanska site"},"content":{"rendered":"<h3 style=\"text-align: left;\"><b>A flexible scaffolding and weather protection solution <\/b><b>enabled <\/b><b>efficient construction in a confined site.<\/b><\/h3>\n<h5 style=\"text-align: left;\"><span style=\"font-weight: 400;\">Site conditions were exceptionally constrained, which required the scaffolding and weather protection solution to continuously adapt to the progress of the construction work. However, the flexibility of the solution enabled smooth operations throughout the entire project.<\/span><\/h5>\n<h5 style=\"text-align: left;\"><i><span style=\"font-weight: 400;\">\u201cWith Oleg, we always reach a mutual understanding of what is needed. He understands the challenges of the site and provides good alternative solutions.\u201d<\/span><\/i><span style=\"font-weight: 400;\">, <\/span><span style=\"font-weight: 400;\">says site manager <\/span><b>Bent Colberg<\/b><span style=\"font-weight: 400;\"> from Skanska.\u00a0<\/span><\/h5>\n<h3 style=\"text-align: center;\"><img loading=\"lazy\" decoding=\"async\" class=\"wp-image-868 aligncenter\" src=\"https:\/\/starteline.fi\/wp-content\/uploads\/2026\/04\/WhatsApp-Image-2026-04-16-at-21.40.54-1-300x134.jpeg\" alt=\"\" width=\"897\" height=\"401\" srcset=\"https:\/\/starteline.fi\/wp-content\/uploads\/2026\/04\/WhatsApp-Image-2026-04-16-at-21.40.54-1-300x134.jpeg 300w, https:\/\/starteline.fi\/wp-content\/uploads\/2026\/04\/WhatsApp-Image-2026-04-16-at-21.40.54-1-1024x458.jpeg 1024w, https:\/\/starteline.fi\/wp-content\/uploads\/2026\/04\/WhatsApp-Image-2026-04-16-at-21.40.54-1-768x344.jpeg 768w, https:\/\/starteline.fi\/wp-content\/uploads\/2026\/04\/WhatsApp-Image-2026-04-16-at-21.40.54-1-1536x687.jpeg 1536w, https:\/\/starteline.fi\/wp-content\/uploads\/2026\/04\/WhatsApp-Image-2026-04-16-at-21.40.54-1-18x8.jpeg 18w, https:\/\/starteline.fi\/wp-content\/uploads\/2026\/04\/WhatsApp-Image-2026-04-16-at-21.40.54-1.jpeg 1600w\" sizes=\"auto, (max-width: 897px) 100vw, 897px\" \/><\/h3>\n<p style=\"text-align: left;\"><span style=\"font-weight: 400;\">We delivered fa\u00e7ade scaffolding and weather protection for Skanska\u2019s building project, Folkh\u00e4lsanhuset i Haga, in Helsinki. The project was a new-build development, constructing a new residential facility for elderly residents.<\/span><\/p>\n<p style=\"text-align: left;\"><span style=\"font-weight: 400;\">We installed fa\u00e7ade scaffolding and extensive weather protection at the site, enabling the construction work to progress smoothly throughout the entire project. The project particularly <\/span><b>highlighted the adaptability, functionality, and ability of the solutions to respond to changing conditions.<\/b><span style=\"font-weight: 400;\">.<\/span><\/p>\n<h4 style=\"text-align: left;\"><b>The confined site posed challenges for the implementation.<\/b><\/h4>\n<p style=\"text-align: left;\">The most significant challenge on site was the extremely confined plot, which limited installation space and required precise planning at every stage of the work.<\/p>\n<p style=\"text-align: left;\"><span style=\"font-weight: 400;\">In addition, the fa\u00e7ade structures created situations where multiple modifications to the scaffolding were required during the project. This demanded continuous responsiveness and adjustment of the structures in line with the progress of the site.<\/span><\/p>\n<h4 style=\"text-align: left;\"><b>Extensive weather protection and adaptable scaffolding<\/b><\/h4>\n<p style=\"text-align: left;\"><span style=\"font-weight: 400;\">The project included:<\/span><\/p>\n<ul style=\"text-align: left;\">\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">Fa\u00e7ade scaffolding with platforms installed at 3-meter intervals\u00a0<\/span><\/li>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">Weather protection measuring approximately 40 \u00d7 25 meters for two buildings\u00a0<\/span><\/li>\n<\/ul>\n<p style=\"text-align: left;\"><span style=\"font-weight: 400;\">The solution was designed to support the different phases of the project from start to finish. The weather protection enabled roofing work regardless of weather conditions, while the scaffolding provided safe and functional working platforms for fa\u00e7ade work.\u00a0<\/span><\/p>\n<figure id=\"attachment_877\" aria-describedby=\"caption-attachment-877\" style=\"width: 336px\" class=\"wp-caption alignright\"><img loading=\"lazy\" decoding=\"async\" class=\"wp-image-877\" src=\"https:\/\/starteline.fi\/wp-content\/uploads\/2026\/04\/WhatsApp-Image-2026-04-16-at-21.29.35-225x300.jpeg\" alt=\"\" width=\"336\" height=\"448\" srcset=\"https:\/\/starteline.fi\/wp-content\/uploads\/2026\/04\/WhatsApp-Image-2026-04-16-at-21.29.35-225x300.jpeg 225w, https:\/\/starteline.fi\/wp-content\/uploads\/2026\/04\/WhatsApp-Image-2026-04-16-at-21.29.35-768x1024.jpeg 768w, https:\/\/starteline.fi\/wp-content\/uploads\/2026\/04\/WhatsApp-Image-2026-04-16-at-21.29.35-1152x1536.jpeg 1152w, https:\/\/starteline.fi\/wp-content\/uploads\/2026\/04\/WhatsApp-Image-2026-04-16-at-21.29.35-9x12.jpeg 9w, https:\/\/starteline.fi\/wp-content\/uploads\/2026\/04\/WhatsApp-Image-2026-04-16-at-21.29.35.jpeg 1536w\" sizes=\"auto, (max-width: 336px) 100vw, 336px\" \/><figcaption id=\"caption-attachment-877\" class=\"wp-caption-text\">Telinety\u00f6t vaiheessa. Telinemateriaali vie paljon tilaa ty\u00f6maalta.<\/figcaption><\/figure>\n<p style=\"text-align: left;\"><span style=\"font-weight: 400;\">During the project:<\/span><\/p>\n<ul style=\"text-align: left;\">\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">The scaffolding was modified multiple times<\/span><\/li>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">Anchoring was changed on three occasions<\/span><\/li>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">The structures were continuously adapted to the needs of the site<\/span><\/li>\n<\/ul>\n<p style=\"text-align: left;\"><span style=\"font-weight: 400;\">The execution required flexibility and close collaboration with the site team. Rapid responsiveness to changing site conditions is a key part of our service.<\/span><\/p>\n<p style=\"text-align: left;\"><span style=\"font-weight: 400;\">Collaboration with the installers also received positive feedback in day-to-day site operations. When asked, the site manager highlighted the smooth and pleasant cooperation with the entire team as a key takeaway from the project.\u00a0\u00a0<\/span><\/p>\n<p style=\"text-align: left;\"><i><span style=\"font-weight: 400;\">\u201cWorking with the Starteline team was once again very smooth \u2014 truly professional performance.\u201d<\/span><\/i><span style=\"font-weight: 400;\">\u201d.\u00a0<\/span><\/p>\n<p><span style=\"font-weight: 400;\">\u2013 Bent Colberg, Site Manager<\/span><\/p>\n<h4><\/h4>\n<h4><\/h4>\n<h4><\/h4>\n<h4><\/h4>\n<h4><\/h4>\n<h4 style=\"text-align: left;\"><b>Smooth workflow throughout the entire project<\/b><\/h4>\n<p style=\"text-align: left;\"><span style=\"font-weight: 400;\">Thanks to the scaffolding and weather protection solution, roofing work could be carried out under cover regardless of weather conditions, fa\u00e7ade work progressed efficiently from the scaffolding, and the site remained fully operational despite limited space.\u00a0<\/span><\/p>\n<p style=\"text-align: left;\"><span style=\"font-weight: 400;\">The solution supported the progress of the project throughout the approximately nine-month period from April to December 2025. At the end of the project, the scaffolding was dismantled by us. <\/span><b>quickly during the holiday period (27\u201331 December 2025)<\/b><span style=\"font-weight: 400;\">, which helped complete the project on schedule.<\/span><\/p>\n<h4><\/h4>\n<h4 style=\"text-align: left;\"><b>Project details<\/b><\/h4>\n<ul style=\"text-align: left;\">\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">Project: Folkh\u00e4lsanhuset i Haga<\/span><\/li>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">Client: Skanska Talonrakennus<\/span><\/li>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">Location: Kauppalantie 9\u201311, Helsinki<\/span><\/li>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">Project type: Residential building (new build, senior housing)<\/span><\/li>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">Scope: Fa\u00e7ade scaffolding and weather protection<\/span><\/li>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">Timeline: 04\u201312\/2025<\/span><\/li>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">Duration: Approximately 9 months<\/span><\/li>\n<\/ul>\n<h4 style=\"text-align: left;\"><b>Solutions for demanding sites<\/b><\/h4>\n<p style=\"text-align: left;\"><span style=\"font-weight: 400;\">The Folkh\u00e4lsanhuset i Haga project is a strong example of how a well-executed scaffolding and weather protection solution supports smooth construction even in challenging conditions.<\/span><\/p>\n<p style=\"text-align: left;\"><span style=\"font-weight: 400;\">When a site demands flexibility and reliability, an effective overall solution is built on experience, careful planning, and the ability to respond efficiently to change.<\/span><\/p>\n<p style=\"text-align: left;\"><i><span style=\"font-weight: 400;\">\u201cI would recommend Starteline precisely because they operate efficiently and collaboration runs smoothly.\u201d<\/span><\/i><\/p>\n<p style=\"text-align: left;\"><span style=\"font-weight: 400;\">\u2013 Bent Colberg, Site Manager<\/span><\/p>\n<p>&nbsp;<\/p>\n<p style=\"text-align: left;\"><b>Do you need a reliable scaffolding and weather protection solution for a demanding project?<\/b><b><br \/>\n<\/b><b>Get in touch and let\u2019s plan an effective solution for your project!<\/b><\/p>\n<p style=\"text-align: left;\">Offers and project management:<\/p>\n<p style=\"text-align: left;\">Oleg poiasnik, +3580 40 732 05 04, <a href=\"mailto:oleg.poiasnik@starteline.fi\">oleg.poiasnik@starteline.fi<\/a><\/p>\n<p style=\"text-align: left;\">Offers and contracts:<\/p>\n<p style=\"text-align: left;\">Alex Vasica, +358 40 725 07 08, <a href=\"mailto:alex.vasica@starteline.fi\">alex.vasica@starteline.fi<\/a>\u00a0<!--more--><!--more--><!--more--><!--more--><\/p>\n<div id=\"simple-translate\" class=\"simple-translate-light-theme\">\n<div>\n<div class=\"simple-translate-button isShow\" style=\"background-image: url('chrome-extension:\/\/cllnohpbfenopiakdcjmjcbaeapmkcdl\/icons\/512.png'); height: 22px; width: 22px; top: 831px; left: 306px;\"><\/div>\n<div class=\"simple-translate-panel\" style=\"width: 300px; height: 200px; top: 0px; left: 0px; font-size: 13px;\">\n<div class=\"simple-translate-result-wrapper\" style=\"overflow: hidden;\">\n<div class=\"simple-translate-move\" draggable=\"true\"><\/div>\n<div class=\"simple-translate-result-contents\">\n<p class=\"simple-translate-candidate\" dir=\"auto\">\n<\/div>\n<\/div>\n<\/div>\n<\/div>\n<\/div>","protected":false},"excerpt":{"rendered":"<p>Joustava teline- ja s\u00e4\u00e4suojausratkaisu mahdollisti tehokkaan rakentamisen ahtaassa kohteessa Ty\u00f6maaolosuhteet olivat poikkeuksellisen ahtaat, mik\u00e4 edellytti teline- ja s\u00e4\u00e4suojausratkaisulta jatkuvaa mukautumista ty\u00f6maan etenemiseen. Ratkaisun joustavuus mahdollisti kuitenkin sujuvan ty\u00f6skentelyn koko projektin ajan. \u201cOlegin kanssa p\u00e4\u00e4semme aina yhteisymm\u00e4rrykseen, siit\u00e4 mit\u00e4 halutaan. H\u00e4n ymm\u00e4rt\u00e4\u00e4 kohteen haasteet ja antaa hyv\u00e4t vaihtoehdot\u201d, kohteen ty\u00f6njohtaja Bent Colberg Skanskalta toteaa.\u00a0 Toteutimme julkisivutelineet [&hellip;]<\/p>\n","protected":false},"author":2,"featured_media":0,"comment_status":"closed","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"footnotes":""},"categories":[1],"tags":[],"yst_prominent_words":[],"class_list":{"0":"post-867","1":"post","2":"type-post","3":"status-publish","4":"format-standard","6":"category-luokittelematon","7":"czr-hentry"},"acf":[],"_links":{"self":[{"href":"https:\/\/starteline.fi\/en\/wp-json\/wp\/v2\/posts\/867","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/starteline.fi\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/starteline.fi\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/starteline.fi\/en\/wp-json\/wp\/v2\/users\/2"}],"replies":[{"embeddable":true,"href":"https:\/\/starteline.fi\/en\/wp-json\/wp\/v2\/comments?post=867"}],"version-history":[{"count":27,"href":"https:\/\/starteline.fi\/en\/wp-json\/wp\/v2\/posts\/867\/revisions"}],"predecessor-version":[{"id":906,"href":"https:\/\/starteline.fi\/en\/wp-json\/wp\/v2\/posts\/867\/revisions\/906"}],"wp:attachment":[{"href":"https:\/\/starteline.fi\/en\/wp-json\/wp\/v2\/media?parent=867"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/starteline.fi\/en\/wp-json\/wp\/v2\/categories?post=867"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/starteline.fi\/en\/wp-json\/wp\/v2\/tags?post=867"},{"taxonomy":"yst_prominent_words","embeddable":true,"href":"https:\/\/starteline.fi\/en\/wp-json\/wp\/v2\/yst_prominent_words?post=867"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}